In the midst of the expansion to 25 million, the grant for the 50 million PPA growth was awarded.[164] The learn plan with the airport consists of design of latest runways plus the terminal within the north side with the airport approach road which replicates the existing runways and terminal to the south of technique road. New cross taxiways will